Before installing any wood floor over concrete you ll need a moisture barrier.
Prep concrete floor for engineered wood.
Typically the floor must be level and uniform within 3 16 inch every 10 feet.
Slab preparation is critical for glue down and includes sanding scraping leveling and filling low spots because the slab must be flat so the planks can fit correctly.
If difference is greater than 2 mm for every 6 feet of the floor it must be aligned.
This video even shows how to remove car.
Typically it is sheets of plastic laid on the slab and taped at the seams with waterproof tape.
Many hardwood floors have been known to last decades.
Hardwood flooring provides long lasting beauty and durability to a home.
Experienced professionals pay close attention to managing moisture and minimizing wood floor expansion and contraction when preparing to install hardwood floors on concrete slabs.
Check the manufacturer s recommendations but in most cases it s a minimum of three days with no maximum.
How to install glue down engineered wood flooring on concrete slab preparation.
Details on all the prep work needed to get your concrete floors ready for new hardwood flooring or even tile install.
Even if your home was built on a concrete slab you can still enjoy the beauty and charm of hardwood floors.
To determine the roughness of the concrete floor we put a direct rail to the floor and a level is determined at any not very smooth place.
Check your wood flooring manufacturer s recommendations and sand any high spots with a concrete grinder.
Installing a hardwood floor over a concrete slab.
You may have to grind down the floor or use a self leveling compound like bostik sl 150 to even out the slab.
It will extend up the wall for about 2 to 3 inches creating a bowl where your wood floor stays dry and protected.
Yet installing hardwood flooring is a big project often best left in the hands of professional wood floor installers.
Currently the national wood flooring association nwfa recommends 1 8 to 3 16 in a 10ft radius.
A little extra time spent prepping the slab benefits our company and results in high quality work making the customer happy.
Next check the boards for warpage or defects and then remove any bad ones.
For glue down wood floors good prep makes the actual installation easier creating efficiencies in production.
Before leveling the floor surface should be cleaned.
It also helps eliminate hollow spots and other movement which are common customer complaints.