Figure 230 10 230.
Service conductors through roof.
If the service mast is used in a through the roof application 120 208v or 120 240v conductor clearances can be reduced to 18 inches over the overhang portion of the roof 230 24 a ex 3.
If the service mast is a through the roof installation meaning that it only penetrates the roof at the overhang to come down to a meter at the exterior wall below as in the photo above then the wires are only required to clear the roof by 18 inches.
Typically a service head consists of a rigid steel conduit like a big pipe that runs up through the roof or along an exterior wall and is topped with a shell like fitting called a weatherhead or weather cap.
Service drop conductors pass over the roof of an intervening building clearance of three feet is required.
The service drop attachment shall not be higher than 20feet above finished grade unless it is stipulated in the metering specifications.
The service drop conductors are not to pass over more than four feet of a.
There are a couple of further stipulations for this exception to be allowed.
If a set of 120 240v overhead service conductors terminate at a through the roof raceway or approved support with less than 6 feet of these conductors passing over the roof overhang the minimum clearance above the roof for these service conductors shall be.
It goes over an open roof on a newer addition for about 12.
Additional services are permitted to supply fire.
Application guidelines for service conductors everything you wanted to know about service conductors and more.
Of service drop conductors 1 2 m 4 ft horizontally pass above the roof overhang and 2 they are terminated at a through the roof raceway or approved support.
The mast itself is on the side of the house but the service drop does not go to the mast from that side of the house.
When the service drop reaches the house it connects to an assembly called the service head also know as the service mast or masthead.
The minimum clearance above only the overhanging portion of the roof shall not be less than 18 inches 457 mm where not more than 6 feet 1829 mm of overhead service conductor length passes over 4 feet 1219 mm or less of roof surface measured horizontally and such conductors are terminated at a through the roof raceway or approved support.
These conductors exit the mast through the weatherhead which is shaped.
If the voltage between conductors does not exceed 300v the conductor clearance over the roof overhang can be reduced from 8 ft to 1 5 ft if no more than 6 ft of overhead conductors pass over no more than 4 ft of roof overhang and the conductors terminate at a through the roof raceway or approved support.
If the slope of the roof exceeds 4 inches for every 12 inches 120 208v or 120 240v conductor clearances can be reduced to 3 feet over the roof 230 24 a ex 2.
The pole is called the mast or riser and it contains a large cable or individual wires known as the service entrance conductors or service entrance cable.